Summary report for "php-tutorial-php.blogspot.com" (monthly stats)

Quick navigation: Traffic summary Adwords keywords & texts Organic keywords Competitors

Advertising budget: N/A

This site in Alpha Directory: p ph php


Approximate SE paid and organic traffic

Traffic Est. Cost
Organic keywords 5.52 $0.28*
Paid keywords N/A N/A
* — "Est. Cost" for organic traffic means amount of money the site owner would pay for such traffic if he bought it in PPC systems.

Try our new SERPTrends addon

SERPTrends add-on allows one to monitor SERP changes and view SEM parameters for sites while using Google, Yahoo! or BING search engines on the fly. Add-on adds trends and a drop-down box with SEM parameters near each search result.

Learn more about SERP Trends addon »



Organic keywords

  Keyword Cost Equiv. Position     Keyword Traffic Position     Keyword   Position  
1. php fsockopen tutorial $0.11  8    1. php fsockopen tutorial 8    1. php fsockopen tutorial   8   
2. fsockopen tutorial $0.11  10    2. fsockopen tutorial 10    2. fsockopen tutorial   10   
3. php soundex $0.06  12    3. php soundex 12    3. php soundex   12   

Competitors for "php-tutorial-php.blogspot.com"

Quick navigation:

Site info

Traffic summary

Adwords keywords & texts

Organic keywords

Competitors

Other top sites:

threetoweraudio.com

threetower.com

threetowers.ca

threetowersflooring.com

threetowners.com

Recently processed sites:

marcosbatuecas.tumblr.com

marcosbeachhotel.reserve-online.net

marcosbeef.com

marcosbellofilm.blogspot.com

marcosbestupholstery.com


Keyword:
Seen on:
Seen URL:
Position:
Clicks per Month:
Keyword avg. CPC:
Monthly Cost Equivalent (avg. cpc * clicks):



Keyword:
Keyword Avg.CPC:
Seen on:
Seen URL: N/A
Page no.:
Ads Block Position:
Ad Position: